| The pulley system used to lift the concrete up to the roof. | 
| Pouring the roof slab of the upper floor guestrooms | 
| Carpenters assembling the window frames | 
| The downstairs sleeping rooms with render and window and door frames | 
| Adding render and decorative features to the front elevation of Shammah House | 
 
